Things tagged 'tower-hamlets'

limited to the area of Newham Cyclists:

14 issues found for 'tower-hamlets':

  • Bow Liveable Streets consultation

    Created by Alex Jenkins // 1 thread

    Liveable Streets is a multi-million pound borough-wide street and public space improvement programme. It aims to improve the look and feel of public spaces in neighbourhoods across the borough and make it easier, safer, and more convenient to get around by foot and bike.

    We’ve listened to your concerns on issues including:

    • The volume and speed of vehicles in residential areas
    • Unfriendly pavements, public spaces and poor crossings for pedestrians
    • Hostile environments for cyclists, particularly for children

    We would now like to hear your feedback on the proposals, which you can do by filling out the below survey by Wednesday 29 July 2020.

    What is proposed and why are these proposals important?

    Every day there are over 33,000 journeys within the Bow area. Of these, 49% are vehicles travelling through the area and not stopping. This means over 16,000 journeys are from non-residents of the local area and these vehicles are contributing to the already unacceptable levels of air pollution on your streets, outside your schools and around your local shops.

    The Liveable Streets proposals will help improve road safety, public spaces, air quality and give the streets back to the residents. However to achieve this some local residents who want to drive may have to travel longer distances.

    Seven main schemes have been developed to improve walking and cycling, create better public spaces, discourage through-traffic and improve air quality. We are proposing traffic changes and calming measures to make local streets safer for everyone. Pedestrian improvements, better street lighting, tree planting and cycling infrastructure are also considered.

    https://talk.towerhamlets.gov.uk/LSBow

    Please sign in to vote.
  • Liveable Streets Bow Trial engagement

    Created by Alex Jenkins // 1 thread

    Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.

    This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.

    During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.

    Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.

    https://www.pclconsult.co.uk/bowtrial/

    Please sign in to vote.
  • Liveable Streets Barkantine engagement

    Created by Alex Jenkins // 1 thread

    Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.

    From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.

    Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.

    Please talk to your neighbours, friends and family and encourage them to take part.

    https://www.pclconsult.co.uk/liveablestreetsbarkantine/

    Please sign in to vote.
  • Chrisp Street Corridor

    Created by Alex Jenkins // 1 thread

    Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.

    Influencing positive changes in road user behaviour is key in providing a safe road environment for the community and although changes in road layout can’t fully resolve this, redesign of our streets can help. Therefore, Chrisp Street and the surrounding areas are currently being invested in with aims to improve road safety for the local community.

    Please give us your feedback by filling in the survey (below the map). You may also like to add a comment to our interactive map of the wider area.

    https://www.pclconsult.co.uk/chrispstreet/

    Please sign in to vote.
  • Bow Liveable Streets Engagement

    Created by Alex Jenkins // 1 thread

    From the consultation website:
    https://www.pclconsult.co.uk/liveablestreetsbow/

    The Liveable Streets programme is part of the Love Your Neighbourhood initiative which aims to improve the area for all by making changes to the street infrastructure. By reallocating road space to walking, cycling and public transport, the scheme will encourage changes in travel behaviour which will help to improve people’s health and well being. The scheme also aims to restrict rat running to improve the safety of residential streets.

    Over a 4-year period, 17 areas across the borough have been identified for the scheme. The image below shows the different areas and phases of the scheme. Liveable Streets Bow is one of the schemes in the first phase of the project.

    We would like to hear what is important to you and the changes you think should be made to encourage more walking, cycling and public transport use in Bow.

    Please sign in to vote.
  • Hackney - Isle of Dogs cycle route

    Created by Simon Munk // 2 threads

    This 7.5km route would stretch from Hackney to the Isle of Dogs via Westferry, Mile End and Victoria Park. It would connect with the cycle routes between Stratford and Aldgate and Barking to Tower Hill, as well as the proposed Rotherhithe to Canary Wharf crossing. There are currently two options in Hackney we want your views on.

    Please sign in to vote.
  • Canary Wharf South Dock Bridge consultation

    Created by Alex Jenkins // 1 thread

    The Tower Hamlets consultation page states "We are consulting on a proposed new pedestrian and cycle bridge to connect Canary Wharf and the Isle of Dogs, called South Dock Bridge. An earlier study has shown that the bridge should align with Upper Bank Street on the north bank of the South Dock and the Berkeley Homes 'South Quay Plaza' scheme on the south bank."

    Consultation closes 23 March.

    Link here: https://www.towerhamlets.gov.uk/lgnl/council_and_democracy/consultations/South_Dock_Bridge_consultation.aspx#ad-image-0

    Please sign in to vote.
  • Cotall Street Consultation: proposed road closure and relandscaping

    Created by julieplichon // 1 thread

    Proposed new landscaping to pedestrianise part of Cotall Street and connect the Limehouse Cut Towpath to the Bartlett Park. This includes the removal of existing parking bays, railings, and part of the towpath wall. The introduction of steps and a ramp to access to the towpath, a small pontoon, cycle parking, and new planting.

    Cotall Street and Canal Wall, London

    https://development.towerhamlets.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=DCAPR_123655

    Tower Hamlets

    Application reference : PA/17/02841/NC

    Please sign in to vote.
  • Tower Hamlets Local Infrastructure Fund consultation

    Created by Alex Jenkins // 1 thread

    The council is consulting on the Local Infrastructure Fund (LIF) to give local people a say in defining the infrastructure priorities for their areas.

    The consultation period will run for six weeks from 27 June 2017 to 8 August 2017.

    Tower Hamlets has grown rapidly in recent years, and a number of new housing and employment developments have been built across the borough. Additional growth is expected in the future and the council recognises that this can put pressure on local services and infrastructure - that is, on areas like transport, schools, healthcare facilities and parks/open spaces.

    To deal with the impacts, developers are required to pay a financial contribution called the Community Infrastructure Levy (CIL). The borough has apportioned to each LIF Area, 25 per cent of the money from which the income was generated. Please refer to the LIF Area Profile documents for the specific amounts collected so far for each LIF Area. The council must then use this money to support the development of the local area, by addressing the demands that development places on the area, and by making sure the right infrastructure and services are in place for residents.

    In addition to understanding local people’s infrastructure priorities, the council is engaging with local people and giving them an opportunity to nominate projects that they would like to see delivered in their neighborhood. These can be new or existing projects already identified by the council in the LIF Area Profiles. Prior to the allocation of funding to any project and in line with the regulations, you will need to clearly demonstrate how the project will deliver the provision, improvement, replacement, operation and/or maintenance of infrastructure or anything else that is concerned with addressing the demands that development places on an area.

    This consultation provides local people with an opportunity to nominate up to three (new or existing) projects. Prior to the allocation of the funding to any project and in line with the regulations it will need to be clearly demonstrated how the project will deliver the provision, improvement, replacement, operation or maintenance of infrastructure or provides anything else that is concerned with addressing the demands that development places on an area.

    Please sign in to vote.
  • Bromley-by-Bow and Marshgate Lane

    Created by Simon Munk // 1 thread

    From TfL:

    Overview
    We are working with the London Boroughs of Tower Hamlets and Newham and the London Legacy Development Corporation to enhance the transport links and public realm at Bromley-by-Bow and Marshgate Lane. The proposals would make it easier for people to cross both the A12 and Stratford High Street by providing new or upgraded pedestrian and cycle facilities, improving access for vehicles, enabling new bus routings, encouraging more walking and cycling, and connecting local communities and new developments in the surrounding area.

    What are we proposing?
    We would like your views on our initial ideas to change the road layout at Bromley-by-Bow and Marshgate Lane.

    Bromley-by-Bow
    Two signalised junctions on the A12, to the north of Bromley-by-Bow station, would provide access to proposed residential and commercial development to the east of the A12
    Vehicles travelling northbound on the A12 would be able to turn right to access these new developments directly, without having to make a u-turn at Bow roundabout
    A bus-only link across the A12 would connect Bromley-by-Bow and new developments to the east
    Signalised crossings, replacing the existing subway at Three Mill Lane, and improvements to the subway at Bromley-by-Bow station would make crossing the A12 easier and more accessible for pedestrians and cyclists
    The proposals would also give west Bromley-by-Bow better links to the open space around the River Lea, the Lea River Park & Leaway, and the Three Mills historic buildings and park
    A segregated cycle track on the east side of the A12 would help improve access to the local cycle network, including the Lea Valley Towpath and Cycle Superhighway 2

    Marshgate Lane
    A new link road, connecting Marshgate Lane with Sugarhouse Lane and creating a four-arm junction with A118 Stratford High Street, would allow buses, cyclists and pedestrians to cross the Bow Back River via a new bridge, improving access to Pudding Mill Lane station and the Queen Elizabeth Olympic Park

    Enabling future bus changes
    In addition to making the area more accessible for pedestrians and cyclists, the proposals for Bromley-by-Bow and Marshgate Lane would enable the creation of a new bus link. This would run from the west of the A12 at Bromley-by-Bow, through new developments either side of the River Lea, and north to the Queen Elizabeth Olympic Park. Any potential changes to bus routes in the area would be subject to a future and separate consultation.

    Traffic impacts
    Should we decide to take the proposals forward to the next stage of design, we would undertake traffic modelling to understand any potential effects of the changes, and summarises the results as part of a further stage of consultation on detailed proposals.

    Why are we proposing this?
    Bow and the wider area are changing. Local regeneration, growth in housing and the legacy development of the Queen Elizabeth Olympic Park are all expected to contribute to changing demands on the transport network. Our key aims for the area are:

    Making the A12 Blackwall Tunnel Northern Approach easier to cross. People prefer being able to cross streets at their convenience. Fast-moving or heavy traffic can make this difficult
    Supporting growth and local businesses by providing better access to new developments, encouraging more walking and cycling, and connecting communities
    Creating a more liveable place. People are more likely to use our streets when their journey is interesting and stimulating, with attractive views, buildings, planting, and where other people are using the street

    Bow Interchange
    In spring 2015 we consulted on improvements to make it easier for pedestrians to cross Bow Interchange safely and provide a new area of public space. Seven new signalised crossings, including two pedestrian/cycle crossings, were opened in June 2016, improving connectivity between Bow and Stratford. You can find more information on the 2015 consultation at: tfl.gov.uk/roads/bow-vision

    We have looked at further options to redesign Bow Interchange and remove both the roundabout and flyover, giving pedestrians and cyclists more direct access to facilities. However, we have now deferred development of this scheme until we can identify the significant funding required to take the plans forward.

    Public exhibitions
    We will be holding the following public exhibitions, where you can view the proposals, speak to members of the project team and submit your response to the consultation:

    Kingsley Hall, Powis Road, London E3 3HJ

    TBC
    Saturday 8 April, 1200-1600
    Thursday 20 April, 1600-2000

    The Vision for Bow and the Healthy Streets Approach
    The pedestrian improvements at Bow Interchange were delivered as part of the Vision for Bow: a place which all road users, passing through, find accessible, safe and connected. You can find more information on the Vision for Bow at tfl.gov.uk/roads/bow-vision

    Announced in February 2017, the Healthy Streets Approach incorporates the objectives and principles of the Vision for Bow. We will therefore deliver the proposals at Bromley-by-Bow and Marshgate Lane as part of this approach, which sets out a long-term plan for improving Londoners’ and visitors’ experiences of our streets, helping everyone to be more active and enjoy the health benefits of being on our streets. You can find more information on the Healthy Streets Approach at tfl.gov.uk/healthy-streets

    Other developments in the Bow area
    The overview map above includes proposals for road layout changes in the Bow area that would be delivered by organisations other than Transport for London. We have included these to show how our proposals fit in to the wider regeneration of the Bow area. These changes are included in the Bromley-by-Bow and Pudding Mill Supplementary Planning Documents, which were consulted on by the London Legacy Development Corporation (LLDC) in winter 2016. Details of these consultations can be found below.

    Please sign in to vote.
  • Monier Road H14 Olympic Park bridge

    Created by Simon Munk // 2 threads

    This is a motor vehicle bridge planned to replace the current cycle/walking bridge from Fish Island to the Olympic Park.

    LLDC said:

    "Bridges H14 and H16 both span the River Lee Navigation and will connect Fish Island to the Sweetwater neighbourhood planned within PDZ4. Under the LCS permission, outline approval was granted for:
    - Bridge H14: A new all-modes bridge (including a vehicular route) connecting Sweetwater to Roach Road/Monier Road.
    - Bridge H16: A new pedestrian and cycle bridge connecting Sweetwater to Stour Road.

    The new all-modes H14 will replace the existing pedestrian and cycle bridge that currently crosses the River Lee Navigation at the same location.
    Condition LCS0.31 of the LCS outline planning permission specifies the information to be provided with RMAs for both Bridges H14 and H16. Table A1 in Appendix A to this Covering
    Letter details how the requirements of Condition LCS0.31 have been met. Appendix A also notes any other relevant LCS planning conditions (Table A2) that are addressed by the RMAs.
    The description of development for the purposes of the Bridge H14 RMA is as follows: “Application for the approval of reserved matters for Bridge H14 with associated works pursuant to condition LCS0.31 of outline planning permission 11/90621/OUTODA being details of layout, scale, appearance, means of access and landscape.”
    The description of development for the purposes of the Bridge H16 RMA is as follows: “Application for the approval of reserved matters for Bridge H16 with associated works pursuant to condition LCS0.31 of outline planning permission 11/90621/OUTODA being details of layout, scale, appearance, means of access and landscape.”

    Please sign in to vote.

41 threads found for 'tower-hamlets':

No library items found for 'tower-hamlets'.

No planning applications found for 'tower-hamlets'.

Back to top