  • Six new routes

    Created by Simon Parker // 1 thread

    Green light for development of six new cycle routes across London

    TfL’s Strategic Cycling Analysis identified the top 25 connections where new cycling infrastructure is required to enable more people to cycle. Further work between TfL and the boroughs has identified these six routes as the initial routes to take forward to the design stage. The routes will extend from Tottenham in the north, to Peckham in the south, and from Barking in the east, to Willesden Junction in the west, "helping to create a pan-London network of high-quality cycle routes".

    The new routes are, it is claimed, an important further step in making the investment required to achieve the Mayor's aim, set out in the draft Mayor's Transport Strategy, of 80 per cent of journeys being made by foot, bike or public transport by 2041.

    TfL and the boroughs will now begin design work on:

    Lea Bridge to Dalston (3)
    This 3km route would link the City and Waltham Forest by filling the gap between Lea Bridge Road and Cycle Superhighway 1 at Dalston

    Ilford to Barking Riverside (10)
    This 8km route would link two bustling outer London town centres and a major growth area with up to 10,800 new homes and a new London Overground connection – while enhancing access to the Elizabeth line and London Overground services

    Hackney to the Isle of Dogs (5)
    This 8km route would stretch from Hackney to the Isle of Dogs via Canary Wharf, Mile End and Victoria Park

    Rotherhithe to Peckham (12)
    This 4km route would link Peckham with key and growing destinations such as Canada Water and Surrey Quays, and connect up other cycling routes such as Quietway 1 and the proposed Cycle Superhighway 4

    Tottenham Hale to Camden (2)
    This 8km route would connect major town centres and will cover seven junctions identified as being among the 73 with the worst safety records

    Wembley to Willesden Junction
    This 5km route would be north-west London’s first major cycle route, connecting Wembley, Stonebridge Park and Willesden Junction. Future sections will connect to planned infrastructure in west London such as CS9 and CS10.

    The Mayor is also committed to providing a new river crossing between Rotherhithe and Canary Wharf for pedestrians and cyclists, which ultimately could link the proposed cycle routes between Hackney and Peckham to create a continuous 12km cycle route. An initial review of the recent consultation on the proposed Rotherhithe and Canary Wharf Crossing showed strong support for the project. TfL is still analysing all the responses and will be announcing the full results of the consultation in the coming months.

    Sadiq Khan said: "I've committed to invest record amounts in making cycling easier and safer for Londoners, and I'm delighted that work is now beginning on designing the next generation of high-quality cycle routes across the capital.

    "Working closely with the boroughs, we’re providing new routes in both inner and outer London, including in areas that haven’t previously seen serious investment in cycling infrastructure."

    Please sign in to vote.
  • London Assembly Transport Committee Bus network design, safety

    Created by Simon Munk // 1 thread

    London Assembly said:
    "Buses are the busiest form of public transport in London. The city has 675 bus routes, with around 9,000 buses in operation and over 19,000 bus stops. Approximately 2.5 billion bus passenger trips are made every year, around double the number made on London Underground.
    "TfL commissions private operators to run bus services in London, awarding seven-year contracts to operate bus routes. Although bus safety (in terms of casualty numbers) has improved over recent years, there was a spike in bus collision fatalities in 2015.
    "The London Assembly Transport Committee is investigating two aspects of bus services in London: Network Design and Safety."

    Please sign in to vote.
  • Mayor's Transport Strategy

    Created by Simon Munk // 1 thread

    Draft Mayor's Transport Strategy 2017
    On June 21 Mayor of London, Sadiq Khan, published a draft of the Mayor's Transport Strategy. The document sets out the Mayor’s policies and proposals to reshape transport in London over the next 25 years.

    About the strategy

    Transport has the potential to shape London, from the streets Londoners live, work and spend time on, to the Tube, rail and bus services they use every day.

    By using the Healthy Streets Approach to prioritise human health and experience in planning the city, the Mayor wants to change London’s transport mix so the city works better for everyone.

    Three key themes are at the heart of the strategy.

    1. Healthy Streets and healthy people
    Creating streets and street networks that encourage walking, cycling and public transport use will reduce car dependency and the health problems it creates.

    2. A good public transport experience
    Public transport is the most efficient way for people to travel over distances that are too long to walk or cycle, and a shift from private car to public transport could dramatically reduce the number of vehicles on London’s streets.

    3. New homes and jobs
    More people than ever want to live and work in London. Planning the city around walking, cycling and public transport use will unlock growth in new areas and ensure that London grows in a way that benefits everyone.

    Please sign in to vote.
  • Bromley-by-Bow and Marshgate Lane

    Created by Simon Munk // 1 thread

    From TfL:

    Overview
    We are working with the London Boroughs of Tower Hamlets and Newham and the London Legacy Development Corporation to enhance the transport links and public realm at Bromley-by-Bow and Marshgate Lane. The proposals would make it easier for people to cross both the A12 and Stratford High Street by providing new or upgraded pedestrian and cycle facilities, improving access for vehicles, enabling new bus routings, encouraging more walking and cycling, and connecting local communities and new developments in the surrounding area.

    What are we proposing?
    We would like your views on our initial ideas to change the road layout at Bromley-by-Bow and Marshgate Lane.

    Bromley-by-Bow
    Two signalised junctions on the A12, to the north of Bromley-by-Bow station, would provide access to proposed residential and commercial development to the east of the A12
    Vehicles travelling northbound on the A12 would be able to turn right to access these new developments directly, without having to make a u-turn at Bow roundabout
    A bus-only link across the A12 would connect Bromley-by-Bow and new developments to the east
    Signalised crossings, replacing the existing subway at Three Mill Lane, and improvements to the subway at Bromley-by-Bow station would make crossing the A12 easier and more accessible for pedestrians and cyclists
    The proposals would also give west Bromley-by-Bow better links to the open space around the River Lea, the Lea River Park & Leaway, and the Three Mills historic buildings and park
    A segregated cycle track on the east side of the A12 would help improve access to the local cycle network, including the Lea Valley Towpath and Cycle Superhighway 2

    Marshgate Lane
    A new link road, connecting Marshgate Lane with Sugarhouse Lane and creating a four-arm junction with A118 Stratford High Street, would allow buses, cyclists and pedestrians to cross the Bow Back River via a new bridge, improving access to Pudding Mill Lane station and the Queen Elizabeth Olympic Park

    Enabling future bus changes
    In addition to making the area more accessible for pedestrians and cyclists, the proposals for Bromley-by-Bow and Marshgate Lane would enable the creation of a new bus link. This would run from the west of the A12 at Bromley-by-Bow, through new developments either side of the River Lea, and north to the Queen Elizabeth Olympic Park. Any potential changes to bus routes in the area would be subject to a future and separate consultation.

    Traffic impacts
    Should we decide to take the proposals forward to the next stage of design, we would undertake traffic modelling to understand any potential effects of the changes, and summarises the results as part of a further stage of consultation on detailed proposals.

    Why are we proposing this?
    Bow and the wider area are changing. Local regeneration, growth in housing and the legacy development of the Queen Elizabeth Olympic Park are all expected to contribute to changing demands on the transport network. Our key aims for the area are:

    Making the A12 Blackwall Tunnel Northern Approach easier to cross. People prefer being able to cross streets at their convenience. Fast-moving or heavy traffic can make this difficult
    Supporting growth and local businesses by providing better access to new developments, encouraging more walking and cycling, and connecting communities
    Creating a more liveable place. People are more likely to use our streets when their journey is interesting and stimulating, with attractive views, buildings, planting, and where other people are using the street

    Bow Interchange
    In spring 2015 we consulted on improvements to make it easier for pedestrians to cross Bow Interchange safely and provide a new area of public space. Seven new signalised crossings, including two pedestrian/cycle crossings, were opened in June 2016, improving connectivity between Bow and Stratford. You can find more information on the 2015 consultation at: tfl.gov.uk/roads/bow-vision

    We have looked at further options to redesign Bow Interchange and remove both the roundabout and flyover, giving pedestrians and cyclists more direct access to facilities. However, we have now deferred development of this scheme until we can identify the significant funding required to take the plans forward.

    Public exhibitions
    We will be holding the following public exhibitions, where you can view the proposals, speak to members of the project team and submit your response to the consultation:

    Kingsley Hall, Powis Road, London E3 3HJ

    TBC
    Saturday 8 April, 1200-1600
    Thursday 20 April, 1600-2000

    The Vision for Bow and the Healthy Streets Approach
    The pedestrian improvements at Bow Interchange were delivered as part of the Vision for Bow: a place which all road users, passing through, find accessible, safe and connected. You can find more information on the Vision for Bow at tfl.gov.uk/roads/bow-vision

    Announced in February 2017, the Healthy Streets Approach incorporates the objectives and principles of the Vision for Bow. We will therefore deliver the proposals at Bromley-by-Bow and Marshgate Lane as part of this approach, which sets out a long-term plan for improving Londoners’ and visitors’ experiences of our streets, helping everyone to be more active and enjoy the health benefits of being on our streets. You can find more information on the Healthy Streets Approach at tfl.gov.uk/healthy-streets

    Other developments in the Bow area
    The overview map above includes proposals for road layout changes in the Bow area that would be delivered by organisations other than Transport for London. We have included these to show how our proposals fit in to the wider regeneration of the Bow area. These changes are included in the Bromley-by-Bow and Pudding Mill Supplementary Planning Documents, which were consulted on by the London Legacy Development Corporation (LLDC) in winter 2016. Details of these consultations can be found below.

    Please sign in to vote.
  • TfL Consultation: Further safety improvements at Bow roundabout

    Created by Shaun McDonald // 1 thread

    Further safety improvements at Bow roundabout
    Overview
    Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions.

    Why We Are Consulting
    As part of this work, we have developed proposals to further improve safety at Bow roundabout.

    What we’re proposing and why

    Bow roundabout is a key junction for cyclists travelling between central and east London.

    Cycle Early Start
    A cycle early-start would operate at the traffic signals on the westbound approach to Bow roundabout.

    This would provide a dedicated green light to allow cyclists to wait ahead of other traffic before moving onto the roundabout.

    A new mandatory cycle lane on the westbound approach would allow cyclists to get to the roundabout entrance without having to filter through traffic.

    The early-start area would be 18 metres deep, so there's a clear space for cyclists in front of any traffic.

    This cycle early-start would improve safety, due to the reduced risk of conflict between cyclists travelling straight ahead and vehicles turning left. It would also provide a quick and direct route through the roundabout for cyclists.

    The eastbound early-start was completed in June 2012. Our provisional monitoring to date shows that the eastbound early-start has been effective in reducing the left turning conflict risk that it was designed to address. It also shows that the cycle lane on the approach is well-used, with significantly fewer cyclists using the footway than before. We will continue to monitor and analyse the operation of these facilities.

    Cycle Bus Stop By-Pass
    TfL is proposing to introduce a new cycle lane around the back of the bus stop on the approach to the roundabout to help cyclists get ahead of other traffic and reduce the risk of conflict between cyclists and buses pulling in and out of the bus stop.

    To accommodate the new cycle lane, the bus lay by would be filled in so buses would stop on the carriageway instead. .

    Please click here to see the map for further information on the proposals.

    We continue to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Bow area.

    We intend to begin work at the roundabout in January 2013. We’ll write to residents and businesses nearer the time to advise on the timing and impact of construction work.