  • Cotall Street Consultation: proposed road closure and relandscaping

    Proposed new landscaping to pedestrianise part of Cotall Street and connect the Limehouse Cut Towpath to the Bartlett Park. This includes the removal of existing parking bays, railings, and part of the towpath wall. The introduction of steps and a ramp to access to the towpath, a small pontoon, cycle parking, and new planting.

    Cotall Street and Canal Wall, London

    https://development.towerhamlets.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=DCAPR_123655

    Tower Hamlets

    Application reference : PA/17/02841/NC

    Please sign in to vote.
  • New London Plan 2017

    Created by Simon Munk // 1 thread

    London.gov.uk says:

    What is the new London Plan?
    The London Plan is one of the most important documents for this city.
    It's a strategic plan which shapes how London evolves and develops. All planning decisions should follow London Plan policies, and it sets a policy framework for local plans across London.
    The current 2016 consolidation Plan is still the adopted Development Plan. However the Draft London Plan is a material consideration in planning decisions. It gains more weight as it moves through the process to adoption, however the weight given to it is a matter for the decision maker.

    Consultation on the draft London Plan
    Consultation on this plan is open. Comments will be publicly available. After the consultation, comments are reviewed by an inspector and you may be called in to discuss comments at the Examination in Public.

    What is an Examination in Public?
    At the end of the consultation period your comments will be reviewed by the independent Planning Inspector appointed by the Secretary of State to carry out the Examination in Public for the London Plan.
    You may be invited to discuss your comments at the Examination in Public. All comments will be made available to the public at the end of the consultation period. The legal provisions for the London Plan are in Part VIII of the Greater London Authority (GLA) Act 1999 (as amended) in sections 334 to 341. The Examination in Public is covered in Section 338.

    Please sign in to vote.
  • Heavy Goods Vehicles Safety Standard Permit /Direct Vision Standard

    Created by Simon Munk // 1 thread

    Tfl says:

    We have undertaken research that shows that in 2015, Heavy Goods Vehicles (HGVs) were involved in disproportionately high numbers of fatal collisions with cyclists (78 per cent) and pedestrians (20 per cent) on London’s streets, despite only making up four per cent of the overall miles driven in the Capital. The Direct Vision Standard (DVS) forms part of The Mayor, Sadiq Khan and TfL’s Vision Zero approach to reducing road danger. The DVS categorises HGVs on the level of the driver’s direct vision from the cab.

    We consulted earlier this year on the principles of a new DVS. Listening to the feedback from this consultation and working closely with industry and stakeholders we have now further developed this scheme. The Consultation report and Responses to Issues Raised document from this first phase of consultation are available to view in from the links at the bottom of this text. The responses showed that, in general, there is support for the principle of a Direct Vision Standard.

    We are now seeking your views on proposals to introduce a new Safety Standard Permit Scheme as part of DVS which widens our approach beyond direct vision and includes a safe system approach to allow us to address a broader range of road danger risks.

    The proposed scheme would require all HGVs over 12 tonnes to hold a Safety Permit to operate in Greater London from 2020. HGVs will be given a rating between ‘zero-star’ (lowest) and ‘five-star’ (highest). Only those vehicles rated ‘one star’ and above would be allowed to enter of operate in London from 2020. Zero rated vehicles would only be allowed if they can prove compliance through safe system measures. By 2024 only ‘three-star’ rated HGVs and above would automatically be given a Safety Permit. HGVs rated two star and below would need to demonstrate increased safety through progressive safe system measures.

    The safe system could include specific industry recognised measures such as sensors, visual warnings and comprehensive driver training. The Safety Standard Permit scheme would evolve over time, taking into account advances in technology.

    Detailed information about the scheme and the approach in which we have arrived at our current proposals are set out in the consultation document. A full Integrated Impact Assessment is also included.

    The consultation approach
    We are undertaking a phased consultation approach at key stages of the development of the consultation proposals to implement the Direct Vision Standard:

    Phase 1 (24 January to 18 April 2017) – we set out the case for HGV driver direct vision and consulted on the Mayor of London’s outline proposals to introduce a Direct Vision Standard for HGVs in London and the principles of the Standard itself. The responses showed that, in general, there is support for the principle of a Direct Vision Standard.

    Phase 2a – policy consultation (this consultation) – this current phase of consultation seeks views and feedback on the scheme proposals as outlined above and within the supporting consultation document which includes supporting technical reports including the full Integrated Impact Assessment. Feedback from this phase of consultation will be used to develop a second IIA and finalise the scheme proposals to be included in phase 2b of the consultation.

    Phase 2b - Final scheme proposals and statutory consultation (Spring/Summer 2018) – this final phase will consult on the final proposals for the HGV Safety Standard Permit Scheme, including statutory consultation on the appropriate regulatory measure to ban or restrict HGVs in London under the scheme, subject to UK Government and European Commission support and notification.

    Please sign in to vote.
  • London Assembly cycling infrastructure investigation

    Created by Simon Munk // 1 thread

    London Assembly says:

    Our investigation
    Over recent years, TfL policy has increasingly focused on the construction of physical cycling infrastructure on London’s roads. A change in direction towards more segregated infrastructure followed our report in 2012 recommending this approach.

    Our investigation will cover the full range of cycling infrastructure in London, with a particular focus on:

    Cycle Superhighways: a form of cycle lane, designed to make cycling safer by helping keep cyclists away from general traffic, and offer direct and continuous cycling on major routes.

    Quietways: a network of cycle routes that link key destinations, improving safety and convenience through small-scale interventions.

    Mini-Hollands: TfL schemes to invest neighbourhood-level improvements in walking and cycling, involving a range of interventions in each area.

    Cycle parking: provision of parking spaces on-street, at stations or in dedicated parking facilities.

    It is important that TfL is able to establish the effectiveness of the infrastructure it installs on London’s roads. We are concerned that to date there has been no comprehensive study of the new infrastructure’s impact on cycling safety, modal share and other road users.

    Questions to answer:

    1. What progress on new cycling infrastructure has been made under Sadiq Khan, and what are his long-term plans?
    2. Has TfL resolved the problems that delayed some cycling schemes under the previous Mayor?
    3. Has segregation delivered the anticipated benefits on the Cycle Superhighways? How many cyclists are using these routes?
    4. To what extent has segregation had negative consequences for other road users and, if necessary, how can this be mitigated?
    5. Have Quietways delivered their anticipated benefits? How many cyclists are using them?
    6. What are the differences in infrastructure between inner and outer London? How can TfL ensure infrastructure in different areas is sufficient and appropriate to the location?
    7. How will TfL’s new ‘Strategic Cycling Analysis’ help determine where and how to invest in infrastructure?
    8. How appropriate is the 400-metre target set in the draft Transport Strategy? Can we equate proximity with access?
    9. Is TfL’s approach to public engagement working effectively to improve scheme designs and meet stakeholder needs?
    10. Are Londoners sufficiently aware of the cycling infrastructure available to them, and how can awareness be increased?
    11. How is TfL using infrastructure to attract a more diverse range of people to cycle in London?
    12. Is there sufficient cycle parking in London, and is it in the right locations?
    13. How are the lessons of the Mini-Hollands and other previous cycling schemes being applied elsewhere?
    14. Should cycling infrastructure be oriented toward longer-distance commuting journeys, or more localised trips?

    Please sign in to vote.
  • London Assembly investigation: Walking & Cycling at Outer London Junctions

    London Assembly says:

    Our investigation
    What different approaches could TfL and London boroughs take to improve junctions and increase walking and cycling in Outer London?

    Small pockets of improvement don’t change the fact that most London streets are dominated by traffic and noise. They are hostile places even to step out into for a pint of milk.

    On behalf of the London Assembly Transport Committee, Caroline Russell AM is investigating how our streets and junctions can become more people-friendly.

    Get involved
    There are a number of specific questions the Committee is seeking to answer. Please address any questions where you have relevant views and information to share, and feel free to cover any other issues you would like the Committee to consider.

    Are there lessons to be learned from previous junction improvements?

    How can we enable more people to walk and cycle?

    How can we make our streets and junctions less hostile to people getting around by bike and on foot?

    How do you get all road users on board?

    Please email transportcommittee@london.gov.uk by August 11 and share the investigation on Twitter using #OuterLondonJunctions

    Key Facts
    The Mayor and TfL are promoting walking and cycling as a form of active travel and a way to reduce health inequalities - however, currently, over 40 percent of Londoners fall short of the recommended 150 minutes of activity per week.

    TfL research has found that people who live in Outer London tend to walk less than those who live in Inner London. Public transport coverage is lower and car ownership is higher in Outer London, with cars making up a larger share of journeys. In particular, people who live in Outer London are less likely to walk children to school, walk to see friends or relatives, and walk to pubs, restaurants and cinemas.

    In 2015:
    53 percent of Inner Londoners walked at least five journeys a week, compared to 35 percent of Outer Londoners
    47 percent of Inner Londoners walked as part of longer journeys on other forms of transport at least five times a week, compared to 41 percent of Outer Londoners

    Please sign in to vote.
  • Rumble strips instead of paint

    Created by Simon here // 2 threads

    Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?

    Please sign in to vote.
  • Vans Parking On Eastway cyclepaths

    Created by Owen E // 1 thread

    During night hours 11pm-1am, dozens of vans pull up on the pavement and side roads blocking the cyclepath [Non-segregated footpath], before they go into the Spitalfields New Market.

    They also often cause a hazard by lefthooking onto the different roads as they pull off easy way.

    Please sign in to vote.
  • Tower Hamlets Local Infrastructure Fund consultation

    Created by Alex Jenkins // 1 thread

    The council is consulting on the Local Infrastructure Fund (LIF) to give local people a say in defining the infrastructure priorities for their areas.

    The consultation period will run for six weeks from 27 June 2017 to 8 August 2017.

    Tower Hamlets has grown rapidly in recent years, and a number of new housing and employment developments have been built across the borough. Additional growth is expected in the future and the council recognises that this can put pressure on local services and infrastructure - that is, on areas like transport, schools, healthcare facilities and parks/open spaces.

    To deal with the impacts, developers are required to pay a financial contribution called the Community Infrastructure Levy (CIL). The borough has apportioned to each LIF Area, 25 per cent of the money from which the income was generated. Please refer to the LIF Area Profile documents for the specific amounts collected so far for each LIF Area. The council must then use this money to support the development of the local area, by addressing the demands that development places on the area, and by making sure the right infrastructure and services are in place for residents.

    In addition to understanding local people’s infrastructure priorities, the council is engaging with local people and giving them an opportunity to nominate projects that they would like to see delivered in their neighborhood. These can be new or existing projects already identified by the council in the LIF Area Profiles. Prior to the allocation of funding to any project and in line with the regulations, you will need to clearly demonstrate how the project will deliver the provision, improvement, replacement, operation and/or maintenance of infrastructure or anything else that is concerned with addressing the demands that development places on an area.

    This consultation provides local people with an opportunity to nominate up to three (new or existing) projects. Prior to the allocation of the funding to any project and in line with the regulations it will need to be clearly demonstrated how the project will deliver the provision, improvement, replacement, operation or maintenance of infrastructure or provides anything else that is concerned with addressing the demands that development places on an area.

    Please sign in to vote.
  • Mayor's Transport Strategy

    Draft Mayor's Transport Strategy 2017
    On June 21 Mayor of London, Sadiq Khan, published a draft of the Mayor's Transport Strategy. The document sets out the Mayor’s policies and proposals to reshape transport in London over the next 25 years.

    About the strategy

    Transport has the potential to shape London, from the streets Londoners live, work and spend time on, to the Tube, rail and bus services they use every day.

    By using the Healthy Streets Approach to prioritise human health and experience in planning the city, the Mayor wants to change London’s transport mix so the city works better for everyone.

    Three key themes are at the heart of the strategy.

    1. Healthy Streets and healthy people
    Creating streets and street networks that encourage walking, cycling and public transport use will reduce car dependency and the health problems it creates.

    2. A good public transport experience
    Public transport is the most efficient way for people to travel over distances that are too long to walk or cycle, and a shift from private car to public transport could dramatically reduce the number of vehicles on London’s streets.

    3. New homes and jobs
    More people than ever want to live and work in London. Planning the city around walking, cycling and public transport use will unlock growth in new areas and ensure that London grows in a way that benefits everyone.

    Please sign in to vote.
  • Charlton Riverside Formal Consultation

    Created by Simon Munk // 1 thread

    Greenwich Council says:
    We want to know your initial views on the draft master plan for Charlton Riverside. Please read the public consultation document and associated documents attached to this listing.
    Description:
    The Council is preparing a new planning policy document. This document will support the existing Core Strategy policies and provide additional detail on the future of Charlton Riverside.
    Royal Greenwich is committed to the regeneration of Charlton Riverside and the creation of a new, sustainable neighbourhood providing both jobs and homes in a balanced way.

    This materplan includes Woolwich Road and a potential parallel new road.

    Please sign in to vote.
  • Bromley-by-Bow and Marshgate Lane

    From TfL:

    Overview
    We are working with the London Boroughs of Tower Hamlets and Newham and the London Legacy Development Corporation to enhance the transport links and public realm at Bromley-by-Bow and Marshgate Lane. The proposals would make it easier for people to cross both the A12 and Stratford High Street by providing new or upgraded pedestrian and cycle facilities, improving access for vehicles, enabling new bus routings, encouraging more walking and cycling, and connecting local communities and new developments in the surrounding area.

    What are we proposing?
    We would like your views on our initial ideas to change the road layout at Bromley-by-Bow and Marshgate Lane.

    Bromley-by-Bow
    Two signalised junctions on the A12, to the north of Bromley-by-Bow station, would provide access to proposed residential and commercial development to the east of the A12
    Vehicles travelling northbound on the A12 would be able to turn right to access these new developments directly, without having to make a u-turn at Bow roundabout
    A bus-only link across the A12 would connect Bromley-by-Bow and new developments to the east
    Signalised crossings, replacing the existing subway at Three Mill Lane, and improvements to the subway at Bromley-by-Bow station would make crossing the A12 easier and more accessible for pedestrians and cyclists
    The proposals would also give west Bromley-by-Bow better links to the open space around the River Lea, the Lea River Park & Leaway, and the Three Mills historic buildings and park
    A segregated cycle track on the east side of the A12 would help improve access to the local cycle network, including the Lea Valley Towpath and Cycle Superhighway 2

    Marshgate Lane
    A new link road, connecting Marshgate Lane with Sugarhouse Lane and creating a four-arm junction with A118 Stratford High Street, would allow buses, cyclists and pedestrians to cross the Bow Back River via a new bridge, improving access to Pudding Mill Lane station and the Queen Elizabeth Olympic Park

    Enabling future bus changes
    In addition to making the area more accessible for pedestrians and cyclists, the proposals for Bromley-by-Bow and Marshgate Lane would enable the creation of a new bus link. This would run from the west of the A12 at Bromley-by-Bow, through new developments either side of the River Lea, and north to the Queen Elizabeth Olympic Park. Any potential changes to bus routes in the area would be subject to a future and separate consultation.

    Traffic impacts
    Should we decide to take the proposals forward to the next stage of design, we would undertake traffic modelling to understand any potential effects of the changes, and summarises the results as part of a further stage of consultation on detailed proposals.

    Why are we proposing this?
    Bow and the wider area are changing. Local regeneration, growth in housing and the legacy development of the Queen Elizabeth Olympic Park are all expected to contribute to changing demands on the transport network. Our key aims for the area are:

    Making the A12 Blackwall Tunnel Northern Approach easier to cross. People prefer being able to cross streets at their convenience. Fast-moving or heavy traffic can make this difficult
    Supporting growth and local businesses by providing better access to new developments, encouraging more walking and cycling, and connecting communities
    Creating a more liveable place. People are more likely to use our streets when their journey is interesting and stimulating, with attractive views, buildings, planting, and where other people are using the street

    Bow Interchange
    In spring 2015 we consulted on improvements to make it easier for pedestrians to cross Bow Interchange safely and provide a new area of public space. Seven new signalised crossings, including two pedestrian/cycle crossings, were opened in June 2016, improving connectivity between Bow and Stratford. You can find more information on the 2015 consultation at: tfl.gov.uk/roads/bow-vision

    We have looked at further options to redesign Bow Interchange and remove both the roundabout and flyover, giving pedestrians and cyclists more direct access to facilities. However, we have now deferred development of this scheme until we can identify the significant funding required to take the plans forward.

    Public exhibitions
    We will be holding the following public exhibitions, where you can view the proposals, speak to members of the project team and submit your response to the consultation:

    Kingsley Hall, Powis Road, London E3 3HJ

    TBC
    Saturday 8 April, 1200-1600
    Thursday 20 April, 1600-2000

    The Vision for Bow and the Healthy Streets Approach
    The pedestrian improvements at Bow Interchange were delivered as part of the Vision for Bow: a place which all road users, passing through, find accessible, safe and connected. You can find more information on the Vision for Bow at tfl.gov.uk/roads/bow-vision

    Announced in February 2017, the Healthy Streets Approach incorporates the objectives and principles of the Vision for Bow. We will therefore deliver the proposals at Bromley-by-Bow and Marshgate Lane as part of this approach, which sets out a long-term plan for improving Londoners’ and visitors’ experiences of our streets, helping everyone to be more active and enjoy the health benefits of being on our streets. You can find more information on the Healthy Streets Approach at tfl.gov.uk/healthy-streets

    Other developments in the Bow area
    The overview map above includes proposals for road layout changes in the Bow area that would be delivered by organisations other than Transport for London. We have included these to show how our proposals fit in to the wider regeneration of the Bow area. These changes are included in the Bromley-by-Bow and Pudding Mill Supplementary Planning Documents, which were consulted on by the London Legacy Development Corporation (LLDC) in winter 2016. Details of these consultations can be found below.

    Please sign in to vote.
  • Monier Road H14 Olympic Park bridge

    Created by Simon Munk // 2 threads

    This is a motor vehicle bridge planned to replace the current cycle/walking bridge from Fish Island to the Olympic Park.

    LLDC said:

    "Bridges H14 and H16 both span the River Lee Navigation and will connect Fish Island to the Sweetwater neighbourhood planned within PDZ4. Under the LCS permission, outline approval was granted for:
    - Bridge H14: A new all-modes bridge (including a vehicular route) connecting Sweetwater to Roach Road/Monier Road.
    - Bridge H16: A new pedestrian and cycle bridge connecting Sweetwater to Stour Road.

    The new all-modes H14 will replace the existing pedestrian and cycle bridge that currently crosses the River Lee Navigation at the same location.
    Condition LCS0.31 of the LCS outline planning permission specifies the information to be provided with RMAs for both Bridges H14 and H16. Table A1 in Appendix A to this Covering
    Letter details how the requirements of Condition LCS0.31 have been met. Appendix A also notes any other relevant LCS planning conditions (Table A2) that are addressed by the RMAs.
    The description of development for the purposes of the Bridge H14 RMA is as follows: “Application for the approval of reserved matters for Bridge H14 with associated works pursuant to condition LCS0.31 of outline planning permission 11/90621/OUTODA being details of layout, scale, appearance, means of access and landscape.”
    The description of development for the purposes of the Bridge H16 RMA is as follows: “Application for the approval of reserved matters for Bridge H16 with associated works pursuant to condition LCS0.31 of outline planning permission 11/90621/OUTODA being details of layout, scale, appearance, means of access and landscape.”

    Please sign in to vote.
  • London Assembly Transport Committee Bus network design, safety

    London Assembly said:
    "Buses are the busiest form of public transport in London. The city has 675 bus routes, with around 9,000 buses in operation and over 19,000 bus stops. Approximately 2.5 billion bus passenger trips are made every year, around double the number made on London Underground.
    "TfL commissions private operators to run bus services in London, awarding seven-year contracts to operate bus routes. Although bus safety (in terms of casualty numbers) has improved over recent years, there was a spike in bus collision fatalities in 2015.
    "The London Assembly Transport Committee is investigating two aspects of bus services in London: Network Design and Safety."

    Please sign in to vote.
  • Quietway 6 Leytonstone Road/Henniker Road/Buxton Road staggered junctions

    Created by MonegaCyclist // 1 thread

    Quietway 6 Leytonstone Road/Henniker Road/Buxton Road staggered junctions

    On the 10th of October 2016, LB Newham proposed to the deal with a staggered junction issue for cycling traffic on the Quietway 6 route with

    1. the installation a new parallel pedestrian crossing (being a zebra pedestrian crossing, together with a crossing point for pedal cycles immediately parallel) on Leytonstone Road with the centre of the crossing to be located 5 metres south of the southern kerb-line of Henniker Road and

    2. Introducing one-way motor vehicle traffic movement on Buxton Road (eastbound only direction) and two-way cycling traffic movements (in both directions).

    Revised March 2016 Newham Cyclists proposed Analysis and comments (figures based on QW6 LB Newham report)

    Intervention 28: Henniker Road/Leytonstone Road/Buxton Road

    Traffic count (on Leytonstone Road)

    18900 vehicles per day
    1300 vehicles per peak hour = CLoS [Safety/Feeling of safety/Total volume of traffic (cycling traffic not separated)] = ‘Critical’ i.e. volume of motor vehicles (>1000 vehicles/peak hour).

    Average speed
    23 – 24 mph (majority of time) = CLoS [Safety/ Feeling of safety/Speed of traffic (cycling traffic not separated)] = ‘Good’ (score = 1)

    NC Suggestions/Recommendations

    Signalise and integrate Henniker Road/Leytonstone Road and Leytonstone Road/Buxton Road junctions.

    Consider a Point Closure (i.e. Modal Filter) at the Leytonstone Road/Buxton Road junction.

    Newham Cyclists previous response to LB Newham

    LB Newham have not given much consideration to our key recommendation based on CLoS/JAT analysis – Signalise and integrate Henniker Road/Leytonstone Road and Leytonstone Road/Buxton Road junctions which will ensure that cycling traffic right turns can be made without crossing more than one lane of moving motor traffic in one step (i.e. separation in space and/or in time).

    No priority is given to cycling traffic at this staggered junction with a 30mph high traffic major road (i.e. Leytonstone Road).

    Conclusion: Newham Cyclists cannot support this junction plan because it doesn’t meet LCC Quietways principles.

    Please let us have your suggestions, recommendations or comments by Friday, 28th of October 2016 so as to help Newham Cyclists draft a group response for Wednesday, 2nd of November 2016 deadline. Many thanks.

    Regards,

    Olawale Ajibola
    Newham Cyclists
    Local Cycle Schemes Lead

    Please sign in to vote.
  • Stratford Town Centre

    Newham council say:

    We are working with Transport for London to transform Stratford town centre. This will include introducing two-way traffic around the Stratford Centre, improving bus services, and providing better facilities for pedestrians and cyclists.

    Changes to the one-way traffic system will allow for a better flow of traffic and reduce accidents in the area. It will also create a safer and more attractive town centre for everyone to enjoy.
    Our plans aim to encourage more people to visit the Broadway, High Street and Cultural Quarter and support our local businesses and cultural venues.

    As part of the plans, we want to:
    - introduce a two-way traffic ​system and road calming measures to reduce speeds
    - create separate cycle tracks to encourage more people to cycle through Stratford
    - widen the pedestrian crossing at Meridian Square and move other crossings to locations where pedestrians prefer to cross
    - improve the appearance of streets by resurfacing pavements, removing old street furniture and introducing new landscaping
    - enhance the public area near Theatre Square and St John’s Church.

    Please sign in to vote.
  • Leytonstone Town Centre mini-Holland

    Created by Simon Munk // 1 thread

    These pages are publicly viewable and for cyclists to discuss consultation responses. Always make sure you *also* respond to the public consultation at its site too!

    Waltham Forest council says:

    Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.
    In 2014, nearly 900 people were injured on our roads and air pollution in Waltham Forest is on the increase. At peak times of the day, we have up to 6,000 extra cars on our roads due to the school run. We need to do something about this so that everyone can get from A to B easily and safely.
    The Mini-Holland Programme is about making our streets work for everyone and our borough a better place to live, work and visit. By creating designated space for cycling, creating routes that better connect our town centres and redesigning some of our public areas we want to help families get about safely, cut down unnecessary traffic outside your home and work with businesses so that people want to spend time in our borough and get the most out of this once in a lifetime opportunity.

    How do I take part?
    We want everyone who lives and works in the local area to have their say on the scheme design and help shape the proposals. To help manage the consultation and feedback we receive, we are asking you to rate and comment on groups of proposals rather than individual measures, and to tell us what else you would like to see.
    Please read each proposal carefully, and tell us your thoughts on each one using the comment section at the bottom of each proposal page. Depending on how much you write, we expect the survey to take no more than 10 minutes to complete.

    What’s planned in Leytonstone Town Centre?
    We have four town centre schemes in the Mini-Holland Programme, one of which is Leytonstone. These schemes will better connect Chingford, Highams Park, Leyton and Leytonstone through key walking and cycling routes, making areas of the borough easier to get to for people who want to walk and cycle for local journeys. The town centre schemes will also improve the look and feel of these four key areas whilst linking in with the four Village schemes in Walthamstow, making them more enjoyable places to spend time and money, boosting business for our local economy and giving our residents a sense of pride in their borough.
    The Leytonstone Town Centre scheme area has over 8,000 addresses and lots of people currently walk and cycle through it to get to the High Road, Leytonstone Underground Station, Leytonstone High Road Rail Station, Queen Elizabeth Olympic Park and Hollow Ponds. We’re planning to make improvements so that if you choose to walk or cycle it’s easier for you to get about. For example, we know that Grove Green Road is a key cycling route through Leytonstone, so we’re planning to improve this by creating segregated areas, where possible, making it safer and easier for people who cycle and vehicles to share the road.
    We’re also planning to install blended ‘Copenhagen’ style crossings on a series of side streets, which extend the pavement across the road, meaning vehicles need to give way to pedestrians and people on cycles. We recognise that there is a place for cars in our borough, but want to make our roads safer by creating junctions that encourage drivers to slow down and take extra care at key points. We’ll also be investing in new public spaces and improving how the area looks with plants and greenery, to encourage more people to spend their time and money in the area. The proposed design also includes a mix of road and traffic direction changes which are shown on the map below.

    What has happened so far?
    In June 2015, we sent a survey to all 8,000 addresses in the scheme area to understand your concerns and aspirations and what you want to see in your local area. Over 340 people responded, providing over 440 individual comments, which we analysed and used to shape the next stage of the plans.
    This feedback helped create an early design which was presented to over 60 residents who attended our codesign workshops in September and October 2015. During these workshops local residents and businesses told us their views of the proposed design to help us make sure this scheme fits everyone’s needs. We have been speaking to key stakeholders (including the emergency services and schools) to make sure the design enables them to do their important work.
    We will continue to engage with these groups as the scheme progresses through to final design and completion. We have also used information about traffic movements and traffic survey data to design a scheme that benefits all road users. More information about this design is detailed in these proposals and we are asking for your views on it.

    What happens next?
    All of the feedback received will be grouped, carefully analysed and used to shape the final design. Where there are elements of the scheme that are not well supported by residents and businesses, we will look at these again. Where it’s possible to make changes based on your comments and suggestions we will, and where we can’t we will explain why.
    A summary of the results and feedback will be sent to everyone who took part after the public consultation stage has ended. This will set out the results and how they have been used to help shape the final design. This will also be available on the website for everyone to see.
    Before we get to the design stage, Transport for London (TfL) will also need to approve the plans as the funders of the Mini-Holland Programme.

    Please sign in to vote.
  • Leyton Town Centre mini-Holland

    Created by Simon Munk // 1 thread

    These pages are publicly viewable and for cyclists to discuss consultation responses. Always make sure you *also* respond to the public consultation at its site too!

    Waltham Forest council says:
    Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.
    In 2014, nearly 900 people were injured on our roads and air pollution in Waltham Forest is on the increase. At peak times of the day, we have up to 6,000 extra cars on our roads due to the school run; we need to do something about it so that everyone can get from A to B safely.
    The Mini-Holland Programme is about making our streets work for everyone and our borough a better place to live, work and visit. By creating designated space for cycling, creating routes that better connect our town centres and redesigning some of our public areas we want to help families get about safely, cut down unnecessary traffic outside your home, and work with businesses so that people want to spend time in our borough and get the most out of this once in a lifetime opportunity.

    Giving your views on the proposed designs
    We want everyone who lives and works in the local area to have their say on the scheme design and help shape the proposals.
    To help manage the consultation and feedback we receive, we are asking you to rate and comment on groups of proposals rather than individual measures, and to tell us what else you would like to see.
    The proposals for the Leyton Town Centre scheme include improving some of the public spaces with plants, trees and public art, changing the way vehicles access some roads to reduce unnecessary traffic outside people’s homes, new and improved crossings to help people who walk and cycle, traffic direction changes and road safety improvements.
    As some of these changes are linked they need to be introduced together, so we have grouped them and are asking for your views by group or ‘series’ of proposals. For example, a new public space with plants, trees and seating may only be possible if access to a road is changed, making it open only to people walking and cycling.
    Please read each proposal carefully, and tell us your thoughts on each one using the comment section at the bottom of each proposal page. Depending on how much you write, we expect the survey to take no more than 10 minutes to complete.

    What’s planned in Leyton Town Centre?
    We have four town centre schemes in the Mini-Holland Programme, one of which is Leyton. These schemes will better connect Leyton, Leytonstone, Chingford and Highams Park, making it easier for people to walk and cycle for local journeys with new and improved walking and cycling routes. The town centre schemes will also improve the look and feel of these key areas whilst linking in with the four Village schemes in Walthamstow, making them more enjoyable places, boosting business for our local economy and giving our residents a sense of pride in their borough.
    The Leyton Town Centre scheme area includes over 11,000 addresses and people walk and cycle through it to get to Leyton Underground Station, Leyton Midland Road Rail Station, the Olympic Park, Westfield shopping centre as well as local shops and amenities.
    We’re planning to make a range of improvements to the area, from reducing the amount of non-local traffic using local streets where residents like you live, to better walking and cycling routes to help you get around more easily and safely if you choose to walk or cycle. We’ll also be investing in new public spaces and improving how the area looks, with new plants and greenery, to encourage more people to spend their time in the area. The proposed design also includes a mix of road and traffic changes which are outlined on the map.

    In June 2015, we sent a survey to all addresses in the scheme area to understand your concerns and how we can use this Mini-Holland funding to deliver what you want in your local area. Over 500 people took part, providing over 690 individual comments which we analysed and used to shape the next stage of the plans.
    This feedback helped create an early design, which we presented to 41 residents as well as businesses that came to our co-design workshops in October 2015. During these workshops you told us what you thought of the proposed design, which has helped develop the scheme.
    We have been speaking to key stakeholders, including the emergency services and schools, to make sure the design enables them to do their important work day to day. We will continue to engage with these groups as the scheme progresses through to final design and completion. We have also used information about traffic movements and traffic survey data to design a scheme that will benefit all road users. More information about this design is detailed in these proposals and we are asking for your views on it.

    What happens next?
    All of the feedback received will be grouped, carefully analysed and used to shape the final design.
    Where there are elements of the scheme that are not well supported by residents and businesses, we will look at these again. Where it’s possible to make changes based on your comments and suggestions we will, and where we can’t we will explain why. A summary of the results and feedback will be sent to everyone who took part after the public consultation stage has ended. This will set out the results and how they have been used to help shape the final design. This will also be available on the website for everyone to see.
    Before we get to the design stage, Transport for London (TfL) will also need to approve all of our plans as the funders of the Mini-Holland programme.

    Please sign in to vote.
  • Progressing the LCC 2014 election campaign 'asks'

    Created by George Coulouris // 7 threads

    This issue is intended to act a repository for material that can be used to back-up the LCC's 2014 Local Election Campaign 'Asks'. There are 6 'asks' that were finalised and agreed at the LCC's AGM on 19 October 2013:

    1. Safe routes to schools
    2. Areas without through motor traffic (AWTTs)
    3. Protected space on main roads/major junctions
    4. Safe cycle routes via parks and canals (Greenways)
    5. 20mph speed limits
    6. Liveable town centres

    so we'll have 6 threads under this Cyclescape issue where we can collect explanations, discussions and most importantly concrete illustrations of what is meant by each ask.

    Please sign in to vote.
  • TfL Consultation: Further safety improvements at Bow roundabout

    Created by Shaun McDonald // 1 thread

    Further safety improvements at Bow roundabout
    Overview
    Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions.

    Why We Are Consulting
    As part of this work, we have developed proposals to further improve safety at Bow roundabout.

    What we’re proposing and why

    Bow roundabout is a key junction for cyclists travelling between central and east London.

    Cycle Early Start
    A cycle early-start would operate at the traffic signals on the westbound approach to Bow roundabout.

    This would provide a dedicated green light to allow cyclists to wait ahead of other traffic before moving onto the roundabout.

    A new mandatory cycle lane on the westbound approach would allow cyclists to get to the roundabout entrance without having to filter through traffic.

    The early-start area would be 18 metres deep, so there's a clear space for cyclists in front of any traffic.

    This cycle early-start would improve safety, due to the reduced risk of conflict between cyclists travelling straight ahead and vehicles turning left. It would also provide a quick and direct route through the roundabout for cyclists.

    The eastbound early-start was completed in June 2012. Our provisional monitoring to date shows that the eastbound early-start has been effective in reducing the left turning conflict risk that it was designed to address. It also shows that the cycle lane on the approach is well-used, with significantly fewer cyclists using the footway than before. We will continue to monitor and analyse the operation of these facilities.

    Cycle Bus Stop By-Pass
    TfL is proposing to introduce a new cycle lane around the back of the bus stop on the approach to the roundabout to help cyclists get ahead of other traffic and reduce the risk of conflict between cyclists and buses pulling in and out of the bus stop.

    To accommodate the new cycle lane, the bus lay by would be filled in so buses would stop on the carriageway instead. .

    Please click here to see the map for further information on the proposals.

    We continue to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Bow area.

    We intend to begin work at the roundabout in January 2013. We’ll write to residents and businesses nearer the time to advise on the timing and impact of construction work.

    https://consultations.tfl.gov.uk/betterjunctions/bow_roundabout/consult_view